Completed Projects |
S.No |
Project Tile |
Year |
Location |
Client |
1 |
FAB Next F08B Supply, Install, testing and Commissioning of the complete Chilled water system with The FAB Building and FAB Gas Farm |
2022 |
Siltronic (Tampines) |
Exyte Singapore Pte Ltd |
2 |
Micron 10A2 Level 2 Fabricate and Install PCW Piping, include support, labeling, flushing, pressure testing and commissioning |
2021-2022 |
Micron 10A2 (Woodlands) |
San Woei Metals Pte Ltd |
3 |
A&A Works Data Center ACMV Fitup Works Additional Chiller x2, Cooling Towers x 2 and One Floor Data Hall Fitup |
2021 |
BDX Data Center (110 Paya Lebar) |
Wah Loon |
4 |
Greenfield Micron 10A2 New CDA Plant Room Piping for CDA, CWS, CHWS, Vent, Drain and Pipe Structure for Compressor, dryer & Cooler |
2021 |
Micron10A1 (Woodlands) |
Ingersoll-Rand |
5 |
Micron 10N Process cooling Water Piping, installation, testing and Commissioning |
2008 |
Micron 10N |
Lead management |
6 |
A&A Works Micron 10A CDA Plant Room Piping for CDA, CWS, CHWS, Vent, drain for Additional Compressor, dryer & Cooler |
2020 |
Micron10A1 (Woodlands) |
Ingersoll-Rand |
7 |
Greenfield F08 –Chilled Water, Condenser Water, Diesel, Newater, Process Water and Reuse Water system F46B –process Cooling Water Systems |
2019-2020 |
Siltronic (Tampines) |
Exyte Singapore Pte Ltd |
8 |
Greenfield Micron 10A1 –New CDA Plant Room, Piping for CDA, CWS, CHWS, Vent, drain and Pipe Structure for Compressor, Dryer & Cooler |
2018 |
Micron10A1 (Woodlands) |
Ingersoll-Rand |
9 |
A&A Works IME A&A Works Piping Works for new PCW, CDA, Process Vacuum plant room |
2018 |
IME |
Takasago Singapore |
10 |
A&A Works IO New Data Center New Chiller Plant (Chiller x 2) with piping to new FCUs & CRACs for Electrical rooms and interlink connection to existing Chiller Plant |
2016-2017 |
IO Data Center |
Wah Loon |
11 |
Greenfield One NET New Data Center New Chiller Plant (Chiller – 3set & future 2 set) and all distribution piping and Two level of data Hall (CRAC -72set) |
2015 |
One Net Data Center |
Wah Loon |
12 |
Greenfield Equinix SG3 New Data Center New Chiller Plant Room (Chiller x 2 & Future x 4), all distribution piping and One Level of Data hall (CRAC -46set) & FCUs -100set |
2014 |
Equinix (SG3) |
Wah Loon |
13 |
Greenfield Norvatis New Plant SS Process piping installation, testing & commissioning for Air system (CDA, IA & PN2), Chemical (Acid, NaOH, etc), Water (Process and Portable Water) and process drain |
2014 |
Norvatis |
Techniques |
14 |
A&A Works Chilled Water piping installation, testing & commissioning for Chiller Plant room (Chiller -3set) and installation of FCUs (150 set), AHU & PAHU (90 sets) |
2014 |
White Sand |
Gennal |
15 |
Singtel Data Center Chilled Water Piping for Chiller plant room (chiller -3set) and Three level of Data Hall (CRAC unit -120set) & FCUs -80set |
2011-2012 |
Singtel Data Center |
Wah Loon |
|
|
|