Projects
 
Completed Projects
S.No Project Tile Year Location Client
1 FAB Next
F08B Supply, Install, testing and Commissioning of the complete Chilled water system with The FAB Building and FAB Gas Farm
2022 Siltronic (Tampines) Exyte Singapore Pte Ltd
2 Micron 10A2 Level 2
Fabricate and Install PCW Piping, include support, labeling, flushing, pressure testing and commissioning
2021-2022 Micron 10A2 (Woodlands) San Woei Metals Pte Ltd
3 A&A Works
Data Center ACMV Fitup Works Additional Chiller x2, Cooling Towers x 2 and One Floor Data Hall Fitup
2021 BDX Data Center (110 Paya Lebar) Wah Loon
4 Greenfield
Micron 10A2 New CDA Plant Room Piping for CDA, CWS, CHWS, Vent, Drain and Pipe Structure for Compressor, dryer & Cooler
2021 Micron10A1 (Woodlands) Ingersoll-Rand
5 Micron 10N
Process cooling Water Piping, installation, testing and Commissioning
2008 Micron 10N Lead management
6 A&A Works
Micron 10A CDA Plant Room Piping for CDA, CWS, CHWS, Vent, drain for Additional Compressor, dryer & Cooler
2020 Micron10A1 (Woodlands) Ingersoll-Rand
7 Greenfield
F08 –Chilled Water, Condenser Water, Diesel, Newater, Process Water and Reuse Water system F46B –process Cooling Water Systems
2019-2020 Siltronic (Tampines) Exyte Singapore Pte Ltd
8 Greenfield
Micron 10A1 –New CDA Plant Room, Piping for CDA, CWS, CHWS, Vent, drain and Pipe Structure for Compressor, Dryer & Cooler
2018 Micron10A1 (Woodlands) Ingersoll-Rand
9 A&A Works
IME A&A Works Piping Works for new PCW, CDA, Process Vacuum plant room
2018 IME Takasago Singapore
10 A&A Works
IO New Data Center New Chiller Plant (Chiller x 2) with piping to new FCUs & CRACs for Electrical rooms and interlink connection to existing Chiller Plant
2016-2017 IO Data Center Wah Loon
11 Greenfield
One NET New Data Center New Chiller Plant (Chiller – 3set & future 2 set) and all distribution piping and Two level of data Hall (CRAC -72set)
2015 One Net Data Center Wah Loon
12 Greenfield
Equinix SG3 New Data Center New Chiller Plant Room (Chiller x 2 & Future x 4), all distribution piping and One Level of Data hall (CRAC -46set) & FCUs -100set
2014 Equinix (SG3) Wah Loon
13 Greenfield
Norvatis New Plant SS Process piping installation, testing & commissioning for Air system (CDA, IA & PN2), Chemical (Acid, NaOH, etc), Water (Process and Portable Water) and process drain
2014 Norvatis Techniques
14 A&A Works
Chilled Water piping installation, testing & commissioning for Chiller Plant room (Chiller -3set) and installation of FCUs (150 set), AHU & PAHU (90 sets)
2014 White Sand Gennal
15 Singtel Data Center
Chilled Water Piping for Chiller plant room (chiller -3set) and Three level of Data Hall (CRAC unit -120set) & FCUs -80set
2011-2012 Singtel Data Center Wah Loon